We are pleased to welcome you to the Gasco Bu Hasa Division. Our main objective is to maximize NGL recovery from the associated Gas in compliance with Gasco HSE Policy which is:
The Bu Hasa Extraction Plant has two trains and carries the distinction of being the first GASCO Plant to come into operation in December 1980. It receives associated Gas from the neighbouring Oil fields and has a feed capacity of 600 MMSCFD. Bu Hasa produces 7200 Tons per Day of NGL on average that is pumped to Ruwais Plant. It also exports 320 MMSCFD of Residue Gas, on average to the Gas network
The extracted NGL is transported to Ruwais along with NGL from the other sites to the GASCO NGL fractionation plant, to produce C2 (Ethane), C3 (Propane), C4 (Butane) and C5+ (Pentane plus).
Currently, the Bu Hasa Upgrading Project (HUP) is in progress to revamp the associated feed gas gathering and handling facilities. Studies are also in progress to restore the plant processing capacity to 600 MMSCFD while maintaining a very high NGL recovery. A 50 km pipeline has been planned to transport the excess High Pressure associated gas expected in the future, to the Habshan – Bab Gas Complex where it would get processed.
Early 2005, the Bu Hasa Integrated Control System project (HICS) was completed, through which the control room was converted from its existing pneumatic control system to modern, more efficient digital technology, without interruption of the production.
The Bu Hasa Extraction Plant has two trains
Train 1 , Train 2
Health, Safety and Environment plays a vital role in our operations (HSEMS).
The Yearly HSE plan is prepared with set targets.
We are very particular about the well being of all the staff working at Bu Hasa Plant Division. We introduced many awareness
Campaigns to educate people in different HSE matters:
Bu Hasa Plant Division reached 12 Million Man-hours Without Lost Time Injury on 31/01/2008.
There are a number of initiatives in Bu Hasa as environmental projects:
Bu Hasa Plant Division reached 12 Million Man-hours Without Lost Time Injury on 31/01/2008.
There are a number of initiatives in Bu Hasa as environmental projects:
HSE INDUCTIONThere are two Emergency Sirens in Bu Hasa: 1. Fire (3 Minutes Intermittent Tone). 2. Gas Leak (3 Minutes Continuous Tone). |
|
Assembly Point |
|
|
EMIRATIZATION |
||||
|
The Training, Development and Integration of UAE National staff is one of the main
objectives in Bu Hasa Plant Division.
The number of UAE Nationals is steadily increasing and we have achieved an overall Emiratization level of 35%. The monthly meeting with UAE National Developees is considered as a valuable training tool for Senior and Junior Developees (27 Nos.). Real work tasks are carried out throughout the CAMS different assignments & PDP’s. Management support during reorganization. (dedicated Job Instructors for each Plant). |
|
|||
|
||||
|
|
|
|