• Projects Group


  • Projects Under EPC Implementation
  • Habshan - 3
  • Ruwais 3rd NGL Train
  • Asab - 2
  • Habshan - 4
  • Offshore Associated Gas Project (OAG)
  • Replacement of NGL Pipelines
  • Bu Has – Habshan Gas Pipeline (EPC)
  • Nitrogen Generation and Injection Projects
  • Natural Gas
  • Habshan Flare Gas Recovery Project


  • Projects Under FEED / EPC Bidding Stage
  • Integrated Gas Development Project (IGD)
  • Shah Gas Development Project (SGD)
  • Asab, Bab, Bu Hasa and Ruwais
      Modifications (ABBR)
  • Asab Gas Development - Phase 2 ( Asab-2)

    Asab 2 Project is designed to recover 6,400 TPD of NGL from the sour condensate rich gas from the existing Asab Gas Plant (AGP). Residue gas will be re-injected back into the reservoir for pressure maintenance purposes (gas cycling).

    Main facilities include two (2) trains each of Gas Treatment and NGL Recovery Units, apart from a new NGL pipeline from Asab to Habshan and the required Utilities and Offsite facilities.

    EPC contract was awarded to M/S Bechtel (USA) in July 2005 and the facilities are planned to be commissioned progressively by 4th Qr.2009.