Asab 2 Project is designed to recover 6,400 TPD of NGL from the sour condensate rich gas from the existing Asab Gas Plant (AGP). Residue gas will be re-injected back into the reservoir for pressure maintenance purposes (gas cycling).
Main facilities include two (2) trains each of Gas Treatment and NGL Recovery Units, apart from a new NGL pipeline from Asab to Habshan and the required Utilities and Offsite facilities.
EPC contract was awarded to M/S Bechtel (USA) in July 2005 and the facilities are planned to be commissioned progressively by 4th Qr.2009.