• Projects Group


  • Projects Under EPC Implementation
  • Habshan - 3
  • Ruwais 3rd NGL Train
  • Asab - 2
  • Habshan - 4
  • Offshore Associated Gas Project (OAG)
  • Replacement of NGL Pipelines
  • Bu Has – Habshan Gas Pipeline (EPC)
  • Nitrogen Generation and Injection Projects
  • Natural Gas
  • Habshan Flare Gas Recovery Project


  • Projects Under FEED / EPC Bidding Stage
  • Integrated Gas Development Project (IGD)
  • Shah Gas Development Project (SGD)
  • Asab, Bab, Bu Hasa and Ruwais
      Modifications (ABBR)
  • Asab, Bab, Bu Hasa & Ruwais Modifications (ABBR)

    The main objective of the project is to implement modifications required to the existing facilities at Asab, Bab, Bu Hasa and Ruwais after taking into consideration the current processing capacity, ongoing projects and projects under development as under:

  • Proposed increase in Oil production by ADCO from 1.4 MMSCFD to 1.6 MMSCFD.
  • Proposed Asab Master Plan Development.
  • Anticipated reduction in Thammama-‘C’ supply.
  • Impact of anticipated increase in sourness of associated and non-associated feed gases.
  • Contract for Front End Engineering and Design (FEED) Services was awarded to VECO in October 2007 and FEED activities are scheduled for completion by progressively by Dec’2008.